Latest information : Central Library Construction Notice

   ■ Preparing for the additional group learning spaces and improving the learning environment, the construction work will be conducted at the Central Library. 
The construction is scheduled to start in the middle of January and will be completed by the end of March.
We apologize for any inconvenience and appreciate your cooperation in advance.
                                                                                                                         
The construction period is as follows:
[1] Shifting the place of seating area from the 3rd floor to the 2nd floor [the middle of January → the middle of February]
[2] Repairing the air-conditioning system
  [January 18th – the end of March]
[3] Replacing the partial carpeting   [on February → on March]
[4] Setting up Global Communication Studio
  [February 12th – the end of March]
[5] Converting special reading room into the learning spaces for group   [on March]

New!!
[6] Reupholstering  chairs  [February - March]
We reupholster chairs at Reading Room and Book Lounge = Honwa-café, sofa in front of   service-desk. Total amount is about 200 chairs.
During the period, there is no chair in several place.
[7] Repairing stacks at basement floor  [18th -25th Feburary]
       We repair the stacks to place more books.
To use materials placed in the basement floor at 18th and 19th February, please ask staff at service desk.
-----------------------------------------------------------------
  ■
There will be intermittent noise during the construction.

  ■ The heater won’t be working during the replacement period of air-conditioning.
    3rd floor :  Jan. 18th – Feb. 27th     
    2nd floor :  Feb. 11th – Mar. 18th
   
It will be cold at the library during construction. Please take precautions wearing something warmer. 

            

      The following areas will be heated as usual
            3rd floor:  Open Studio, Group Studio A・B, AV Room  
            2nd floor:  Book Lounge(Honwa-cafe)
           
Please use these areas during the construction.
 ■ Part of the reading area will be unavailable during the period as shown below.
    3rd floor :  Jan. 18th – Feb. 27th      
    2nd floor :  Feb. 11th – Mar. 16th
      
For more details the construction areas, please follow further notice.
 ■
We will reduce opening time and close Library temporarily.
 
 
Library closure:  Feb. 20th Feb. 28th
        For more information, please refer to the calendar at the Central Library Website .

Contact:
Central Library Office
Tel: 076-264-5211
E-mail: etsuran@adm.kanazawa-u.ac.jp